How to Get Power Turned On in a Vacant House in Memphis: Re-Inspection and Meter Put Back

Home – Single Post

get power turned on in a vacant house

To get power turned on in a vacant house in Memphis, the electrical system may need a re-inspection first. According to Memphis and Shelby County’s electrical code, a residential building out of service for 365 days or more, or a commercial property out of service for 90 days or more, cannot have its interior wiring energized until the Building Official re-inspects it and issues a certificate. An owner or tenant can request the inspection for a $50 fee, and repairs must be done by a licensed or registered electrical contractor under a new permit. This guide covers the steps, fees, and fire and flood cases.

Key Takeaways

  • The county’s code requires a re-inspection and certificate before interior wiring is energized in a residential building out of service for 365 days or more, or a commercial property out of service for 90 days or more.
  • The code lists a $50 fee for an owner or tenant to request one inspection. Repairs must be done by a licensed or registered electrical contractor under a new permit.
  • The code defines “minor repairs” for this section as strapping, replacing switches, receptacles, and light fixtures, ground rod clamps, labeling, and device plates.
  • After a fire, MLGW says to hire a licensed contractor, have the contractor call MLGW at 729-8630 (option 1), and request an inspection if your code office requires one.
  • After a flood, ESFI says to keep the power off until an electrician has inspected the system.
  • The rule was adopted for the City of Memphis and unincorporated Shelby County. Bartlett and Collierville run their own code offices, so confirm which one covers your address.

What Is a “Meter Put Back,” and Why Might a Vacant House Need One?

“Meter put back” is the phrase the county’s electrical code uses in a chapter titled “Interior Wiring Out of Service; Meter Put Back.” It describes restoring service to a building whose interior wiring has been out of service for a long time. The county’s published electrical code sets the rule.

The rule has two thresholds. A residential building that has been out of service for 365 days or more cannot have its interior wiring energized without a re-inspection and a certificate from the Building Official. A commercial property is covered after 90 days. The section also applies to new buildings that have never been occupied, as well as to buildings left vacant after being occupied.

The code does not explain the reasoning behind the rule, so this guide does not guess at it. What it does say is that the inspection and certificate come first, and that in emergency situations the inspector is authorized to issue a temporary certificate until a re-inspection can be made.

When the Rule Applies

Property TypeThreshold in the CodeNotes
Residential, previously occupiedOut of service 365 days or moreRe-inspection and certificate before energizing
Residential, never occupiedThe code names new buildings never occupiedAsk Code Enforcement how your permit history applies
CommercialOut of service 90 days or moreShorter window than residential
EmergencyTemporary certificate possibleIssued by the inspector until re-inspection can be made

Does the Re-Inspection Apply to Your Property?

It depends on how long the building’s electrical service has actually been out. The code uses the phrase “out of service” without defining it in that section, so the safest approach is to ask. MLGW may be able to tell you when service was disconnected, and the county’s Electrical section can explain how it counts your property.

Common Situations

Your SituationWhat to Check
You are buying a vacant house with the power offAsk MLGW for the disconnect date. If it has been off for 365 days or more, the rule may apply
You inherited a home that has sat emptySame question. The length of time without service is what matters
A rental unit sat empty between tenantsIf the service stayed on, the long-vacancy rule may not be triggered. Confirm with Code Enforcement
A commercial space has been dark for several monthsThe commercial threshold is 90 days
The building was damaged by fire or floodA separate process may apply. See the fire and flood sections below

None of these is a final answer. The Building Official interprets the code, so a short call to the county before you spend money is worth it.

What Are the Steps to Get Power Turned On in a Vacant House?

The order matters because the code ties the energizing of the system to the inspection. Under the code, no one is to connect a utility to a building or system that requires a permit until the Building Official releases it.

  1. Find out how long service has been off. Ask MLGW when the account was disconnected.
  2. Confirm which office covers your address. Memphis and unincorporated Shelby County use the county’s Construction Code Enforcement. Bartlett and Collierville have their own offices.
  3. Ask whether a re-inspection is required. Call the Electrical section and describe the property, how long service has been off, and whether it has ever been occupied.
  4. Request the inspection. An owner or tenant can apply to the Building Department. The county also publishes a Safety Inspection Request form, one per address, for residential or commercial properties. Ask Code Enforcement whether it is the right form for your situation.
  5. Prepare the building. The form says an operable smoke detector is required for a residential inspection.
  6. Let the inspector review the wiring. The result is either a certificate or a list of repairs.
  7. If repairs are needed, hire a licensed or registered electrical contractor. The contractor applies for a new permit, does the work, and the system is re-inspected.
  8. Wait for the approval to reach MLGW. MLGW’s guide says the code inspector’s office contacts MLGW when work has been approved.
  9. Ask MLGW to turn on service. MLGW’s guide for obtaining service says meters are typically left locked off and gives Builder Services at (901) 729-8630 for turn-on, with a possible deposit. Ask MLGW which process fits an existing home.
  10. Keep the paperwork. The certificate, permit, and inspection record are useful at resale and for insurance.

You can read MLGW’s wording in its guide to obtaining utility service.

What Does the Re-Inspection Cost?

The code names specific fees, and they are small compared with the repairs an inspection might uncover.

Fees Named in the County’s Electrical Code

FeeAmount in the CodeNotes
Owner or tenant request, one inspection$50Covers a single inspection by the department
Minor repair under this section$15 minimum, before surchargesA higher amount applies if the standard fee provisions exceed it
Contractor requestThe re-inspection fee plus the repair feeMinimum additional fee of $15, before surcharges
Work started before the permitAn additional fee equal to 100% of the permit feeApplies to electrical work begun without a permit
Inspections beyond those in the permit fee$50 eachPer the code’s inspection provisions

These amounts come from the code text and may change, so confirm current fees with Code Enforcement. The electrician’s labor and materials are separate, and this guide does not put a price on them. Repair costs vary with what the inspector finds, so ask for an itemized estimate after the inspection.

What Counts as a Minor Repair?

For this section only, the code defines minor repairs as strapping, replacing switches, receptacles, and light fixtures, reconstructing or replacing ground rod clamps, labeling, and installing device plates. The $15 minimum fee in the same section applies to minor repair work.

A re-inspection can also lead to larger work. Three parts of the code are worth knowing:

  • Service hazards. If the Building Official finds an electrical system is a hazard because of inadequate service, improper fusing, insufficient receptacle and lighting outlets, improper wiring or installation, or deterioration or damage, the code says the defects must be corrected.
  • Unsafe systems. The code declares an electrical system unsafe if it constitutes a fire hazard or is otherwise dangerous to human life, and gives the Building Official authority to order it removed or restored to a safe condition.
  • Alterations. Renovations and repairs must meet the provisions for new construction unless the work follows the same manner and arrangement as the existing system, is not hazardous, and is approved.

It is hard to tell from the outside which category a property falls into. If the property has an older panel or service equipment, Ace Electric’s guide to electrical panel upgrade cost in Memphis explains what that kind of work involves.

What Happens After a Fire?

Fire damage has its own process. MLGW’s Restoring Services After a Fire page lays it out in three steps:

  1. Contact a licensed contractor. For each affected utility, a licensed professional makes the repairs and ensures the system is safe and up to code.
  2. Start the restoration process. The contractor calls MLGW at 729-8630 and selects option 1 to begin the work order process.
  3. Request an inspection if required. Your local code enforcement office may need to inspect and approve the repairs before service is restored.

If you do not plan to use any utility at the location for an extended period, MLGW lists 544-6549 for residential customers and 528-4270 for business customers to request disconnection. For transformer fires, MLGW says it will visit to clean up around a damaged transformer and a crew will return in one to three business days for a follow-up inspection.

MLGW’s guide to obtaining service adds that after a fire you may have to contact a licensed electrician or plumber before utilities can be restored, because an updated inspection of the electrical or gas work is needed. After MLGW receives the necessary inspections, it coordinates reconnection.

Do not try to energize a fire-damaged building yourself. The county’s code says no one is to connect a utility to a regulated system that requires a permit until the Building Official releases it.

What About Flood or Storm Damage?

For flooding, the Electrical Safety Foundation International says that if your home experienced flooding, keep the power off until an electrician has inspected your system. It also says to have an electrician inspect appliances that have been wet, and not to turn on or plug in appliances unless an electrician says it is safe. A trained professional may be able to recondition some devices, while others require replacement.

For storm damage to the equipment that connects your home to MLGW, the rule is different. MLGW’s outage center says the weatherhead and meter center are not MLGW property. If they are damaged, a licensed electrician must repair them and Code Enforcement must inspect them before MLGW restores power.

If you are dealing with an active emergency, Ace Electric’s emergency electrician guide covers which problems call for a same-day response.

What If the Property Is Commercial?

The code sets a shorter window for commercial properties: 90 days out of service rather than 365. The same inspection-and-certificate requirement applies, and repairs must be done by a licensed or registered electrical contractor under a permit. For business accounts, MLGW lists 528-4270 on its fire restoration page for disconnection requests.

If you are leasing or buying commercial space that has been dark for a few months, ask about the re-inspection before you plan an opening date. The inspection and any repairs can sit between you and a working building.

Who Can Do the Repairs?

The code requires a licensed or registered electrical contractor for repairs identified in a re-inspection, working under a new permit. The county’s code also includes a narrow homeowner exception for a single-family dwelling that serves as the homeowner’s principal residence, is not intended for rent, lease, or resale, and where the work is done solely by the homeowner or immediate family after passing an exam.

For investors, landlords, and heirs who plan to rent or sell, that exception generally will not apply. If you are buying to resell, Ace Electric’s guide to electrical upgrades before selling a house covers how electrical issues surface at resale.

What Should You Do Before You Close on a Vacant Property?

If you are buying a property that has been vacant, these steps can reduce surprises. They are suggestions, not code requirements.

Pre-Closing Checklist for a Vacant Property

StepWhy It Helps
Ask the seller for the service historyIt shows when power was last on
Ask MLGW for the disconnect dateThe 365-day and 90-day thresholds depend on it
Ask Code Enforcement whether a re-inspection is requiredThe Building Official interprets the code
Schedule an electrician walkthrough before your due diligence period endsIt gives you a view of likely repairs before you commit
Check smoke detectorsThe county’s form says an operable one is required for residential inspections
Budget time as well as moneyInspection, repairs, re-inspection, and MLGW turn-on happen in sequence
Keep every documentThe certificate and permit records matter later

Which Office Covers Your Address?

The ordinance that adopted this code says it takes effect in the City of Memphis and the unincorporated areas of Shelby County. That is the area this guide follows.

Code Enforcement Contacts

Where the Property IsOfficePhone
Memphis and unincorporated Shelby CountyShelby County Construction Code Enforcement(901) 222-8300
Same area, Electrical sectionElectrical(901) 222-8395
Same area, Licensing sectionLicensing(901) 222-8390
BartlettBartlett code enforcement, as listed by MLGW(901) 385-6425
ColliervilleCollierville code enforcement, as listed by MLGW(901) 457-2310

The county numbers come from the Shelby County directory, and the Bartlett and Collierville numbers come from MLGW’s code enforcement page. Other cities in the county may have their own rules, so confirm yours before you act.

Frequently Asked Questions

Do I need an inspection to get power turned on in a vacant house in Memphis?

Possibly. The county’s electrical code requires a re-inspection and certificate before interior wiring is energized in a residential building that has been out of service for 365 days or more. Ask MLGW for the disconnect date and ask Code Enforcement how it applies to your address.

How much does a re-inspection cost?

The code lists $50 for an owner or tenant to request one inspection. If repairs are needed, a licensed or registered contractor applies for a new permit, and the code lists a $15 minimum for minor repair work before surcharges. Fees can change, so confirm the current amounts with the county.

Who can do the electrical repairs after a re-inspection?

A licensed or registered electrical contractor, working under a new permit. The code allows a narrow exception for homeowners working on their own principal residence, but it does not cover rentals or properties intended for resale.

Does the rule apply to a rental unit between tenants?

It depends on how long the unit’s electrical service was out. The code’s trigger is a building out of service for 365 days or more, so a brief vacancy with power on may not meet it. Confirm with Code Enforcement if you are unsure.

What should I do if my house had a fire?

MLGW says to hire a licensed contractor to make repairs, have the contractor call 729-8630 (option 1) to start a work order, and request an inspection if your code office requires one. Do not energize the building yourself.

Can power be turned on before the re-inspection in an emergency?

The code says that in emergency situations the inspector can issue a temporary certificate until a re-inspection can be made. That is the inspector’s decision, so ask Code Enforcement what applies to your situation.

Final Word

A building that has been out of service for a long time may need an inspection, and sometimes repairs, before its meter can be turned back on. The delay and cost can come from finding that out late, after a closing date or an opening date is already set.

If you need to get power turned on in a vacant house, ask MLGW when service was disconnected, ask the county whether a re-inspection applies, and have an electrician look at the building before you commit to a timeline. If you are buying, inheriting, or managing a property in this position and want an electrician to inspect it, Ace Electric provides residential and commercial electrical inspections and repairs across Shelby County. You can reach the team at (901) 870-3298.

Curated by Ace Electric,
Your trusted electricians in Tennessee.

About Us

Your go-to for 24/7 residential and commercial electrical services in Memphis and Tennessee. With 20+ years of expertise, we ensure safety and satisfaction. Contact us to illuminate your space.

Recent Articles

Trusted 24/7 Electrical Experts

With a steadfast commitment to safety and 24/7 availability, we provide top-tier services for residential, commercial, and industrial clients.

Follow Us :