An electrician license in Memphis has two layers. Tennessee requires a state contractor license with a CE classification for electrical work of $25,000 or more, and Memphis and Shelby County require electrical contractors to hold a local license or registration through the Office of Construction Code Enforcement. The state’s limited licensed electrician credential is not accepted here. You can check the state record online, confirm the local registration by phone, and then confirm a permit exists for your address. This guide gives the steps, the red flags, and what the county’s code requires of every electrical contractor.
Key Takeaways
- An electrician license in Memphis comes in two layers: a state CE contractor license, required at $25,000 and up, and a local license or registration with Memphis and Shelby County’s code office.
- The state’s limited licensed electrician (LLE) credential is not accepted in Memphis and Shelby County, Bartlett, or Collierville, according to the Tennessee Board.
- Verify the state license online, confirm the local registration by calling (901) 222-8390, and check that a permit exists for your address.
- Permits go to licensed or registered contractors, so a contractor who asks you to pull the permit is a warning sign.
- The county’s code requires contractors to carry a $25,000 bond and proof of insurance, and to show the firm’s name and registration number on their vehicles.
- Bartlett and Collierville run their own code offices, so the local steps differ if you live there.
What Does an Electrician License in Memphis Actually Cover?
Two licensing systems apply at once, and many online guides cover only the first. The state licenses contractors by project size. Memphis and Shelby County then require a local license or registration on top of that.
Who Licenses What
| License or Registration | Who Issues It | What It Covers |
|---|---|---|
| State contractor license, CE classification | Tennessee Board for Licensing Contractors | Electrical work of $25,000 and up. Accepted statewide, and carries a monetary limit that must cover the whole project |
| State limited licensed electrician (LLE) | Tennessee Board for Licensing Contractors | Work under $25,000, but only where a jurisdiction accepts it. Memphis and Shelby County, Bartlett, and Collierville do not |
| Local contractor license or registration | Memphis and Shelby County Office of Construction Code Enforcement | Required to do electrical work in the city or county. A state CE contractor must register locally |
| Master electrician | Building Official | The person in general charge and supervision of an electrical contractor’s business |
| Journeyman electrician | Memphis and Shelby County code | Wires under the direction of a master electrician who obtained the permit |
The Tennessee Board’s own licensing document puts the key points plainly. The CE license is accepted statewide, but the contractor must still follow local permit and licensing rules and pay local fees. A contractor with a CE is exempt from the LLE license but must still obtain permits, inspections, and applicable local licenses, such as a business license.
The county’s published electrical code says it is a violation for anyone to do electrical work in the city or county without being licensed or registered under that code. It defines an electrical contractor as one holding a current license from the Office of Construction Code Enforcement, or a properly registered certified state contractor.

Which Rules Apply Where You Live?
It depends on your city. Develop901, the joint Memphis and Shelby County planning site, says its Construction Enforcement department covers Memphis, Arlington, Germantown, Lakeland, Millington, and unincorporated Shelby County.
Bartlett and Collierville are different. The Tennessee Board’s list of jurisdictions that do not accept the LLE license names both of them separately, and MLGW’s code enforcement page lists their own contacts.
Who to Call by Location
| Where the Work Is | Office to Contact | Phone |
|---|---|---|
| Memphis, Germantown, Millington, Arlington, Lakeland, and unincorporated Shelby County | Memphis and Shelby County Construction Code Enforcement | (901) 222-8300 |
| Licensing questions, same area | Licensing section | (901) 222-8390 |
| Electrical questions, same area | Electrical section | (901) 222-8395 |
| Bartlett | Bartlett code enforcement, as listed by MLGW | (901) 385-6425 |
| Collierville | Collierville code enforcement, as listed by MLGW | (901) 457-2310 |
The county numbers come from the Shelby County directory. Outside Shelby County, rules differ by city and county, so ask the local code office before you hire.
The rest of this guide follows the Memphis and Shelby County rules.
Which License Does Your Job Need?
The answer depends on the size and type of the work. Use this table to match your project to the right question for the contractor.
License Questions by Job Type
| Your Job | What to Ask or Check |
|---|---|
| Repair or install under $25,000 in Memphis or Shelby County | Local license or registration. The state LLE license is not accepted here |
| Project of $25,000 or more | A state CE license whose monetary limit covers the whole project, plus local registration |
| Alarm, communication, or other low voltage wiring | The county’s code lists separate low voltage and alarm contractor classes, so confirm the right one |
| Illuminated signs | The code lists a separate supervising sign installer license |
| Wiring at an air conditioner or heat pump | The code lets a licensed mechanical contractor hold an HVAC and electrical permit for work on the load side of the equipment’s disconnect, so ask who handles the branch circuit |
| Commercial property | A license is required. The homeowner exception covers residential dwellings only |
A contractor who is licensed for one of these is not automatically licensed for the others. Ask which class they hold and make sure it matches your job.
How Do You Verify an Electrician’s License, Step by Step?
This takes little time, and it is worth doing before you sign anything or pay a deposit.
- Get the details in writing. Ask for the company’s full legal name, its state license number, and its Shelby County registration number. Do this before the quote, not after.
- Check the state record. Use the Verify a License tool linked from the Tennessee Board for Licensing Contractors. Look at the license status, the classification, and the monetary limit. The Board says a contractor’s monetary limit must cover the total electrical project.
- Look up the record yourself. As of September 17, 2026, the Board no longer mails paper license certificates. Licensees can print a copy from the state’s system. A printout is easy to share, but you should still search the record directly.
- Confirm the local registration. Call the county’s Licensing line at (901) 222-8390, or the Electrical section at (901) 222-8395. Develop901’s page lists a search for licensed contractors, and its portal asks you to log in or create an account to use its services.
- Check the truck. The county’s code requires vehicles used for electrical work to show the firm’s full name in lettering at least 2 inches high and its registration number in lettering at least 1.5 inches high, on both sides. Leased or employee vehicles may carry temporary signs, so ask about it rather than assume.
- Ask for proof of insurance. The code requires contractors to carry insurance equal to or exceeding what the Tennessee Department of Commerce and Insurance requires, and to submit a certificate of insurance or a workers’ compensation policy. There is an exception for people who are not required to carry workers’ compensation coverage.
- Confirm who pulls the permit, then check it. Permits are issued only to licensed or registered contractors. After the permit is filed, you can use Develop901’s Search Permit Activity page to see that one exists for your address.
- Check the discipline record. The Tennessee Board’s site has consumer pages for disciplinary actions and for filing a complaint.

What Should You Ask Before You Hire, Beyond the License?
A valid license answers who the contractor is. These questions answer how the job will go.
- Who will be on site? The code ties permitted work to the permit holder’s employees, or to temporary labor under the direct supervision of one of them.
- Is the permit included in the price? Ask who files it and who schedules the inspections.
- What exactly does the estimate cover? Ask for an itemized scope in writing, with materials, labor, and any panel work listed separately.
- Whose name is on the contract and invoice? It should match the licensed company.
- What happens if the inspection fails? The code expects corrections and a new inspection, so ask who pays for the return visit.
Does the Name Match Everywhere?
| Document | Should Match |
|---|---|
| State license record | The company name on the quote |
| County registration | The same company name |
| Work vehicle signage | The same name, plus the registration number |
| Permit | The licensed contractor who will do the work |
| Contract and invoice | The licensed company, not an individual or a different business |
| Certificate of insurance | The licensed company |
A mismatch is not always fraud. It can be a rebrand or a paperwork lag. It is always worth a phone call before you pay.
What Does Shelby County’s Code Require of Every Electrical Contractor?
These are the requirements you can use as a checklist. Some you can check yourself, and some you can only ask about.
Contractor Requirements Under the County’s Code
| Requirement | What the Code Says | How You Can Check It |
|---|---|---|
| License or registration | Electrical work needs a license or registration under the code | Call the Licensing line |
| Bond | A $25,000 bond filed with the Building Official | Confirm registration is current with the county |
| Insurance | Coverage at least equal to the state’s requirement, with a certificate or workers’ compensation policy on file | Ask for the certificate |
| Vehicle signage | Firm name and registration number on both sides of work vehicles | Look at the truck |
| Advertising | Ads must use the company name on file with the county; fines of up to $50 per offense, per day | Match the ad, quote, and license name |
| Billing | Contracting, accepting payment, or invoicing in another firm’s name is a violation | Check who the contract and invoice are in |
| Permits | Issued only to licensed or registered contractors; work done by the permit holder’s employees or supervised temporary labor | Ask who will be on site |
The code also lets the Building Official suspend a permit if the work is being done by people who are not employees of the firm that holds it, unless the code allows it. That discourages a licensed company from lending its permit to another crew.
What Are the Red Flags When Hiring an Electrician?
Most problems show up before the work starts. Use the table when you compare quotes.
Warning Signs and Why They Matter
| Red Flag | Why It Matters |
|---|---|
| Won’t give a license or registration number | You cannot verify anything without one |
| Quote, card, or truck shows a different name than the licensed company | The code requires advertising under the name on file, and billing under the licensed contractor’s name |
| Asks you to pull the permit | Permits go to licensed or registered contractors, and the homeowner exception is narrow |
| Says no permit is needed, with no reason | The county’s code lists only a few exemptions, such as listed plug-in temporary decorative lighting, and the Tennessee Board says permits and inspections are required for all electrical work regardless of cost |
| Calls himself an electrical contractor but holds only an LLE | The Board says LLE holders may not use the term “contractor,” and the LLE is not accepted in Memphis and Shelby County |
| No name or registration number on the work truck | The code requires both, with an allowance for temporary signs on leased or employee vehicles |
| Cash only, no invoice in the company name | The code treats billing under another name as a violation |
| Starts before the permit is issued | The code adds a fee equal to the permit fee for work started early |
What Should Happen After You Hire a Verified Electrician?
The paperwork does not end at the contract. For permitted work, the county’s code sets out a sequence you can follow along with:
- The contractor obtains the permit before the work begins.
- Wiring that will be hidden inside walls or ceilings has to stay accessible and exposed until it is approved.
- The rough-in inspection happens after the framing and all concealed wiring are complete, and before wall or ceiling coverings go on.
- Work is not supposed to go past an inspection point without approval.
- A final inspection happens after all work under the permit is complete.
If your electrician wants to close up walls before the rough-in inspection, ask why. The code puts the duty on the permit holder to keep the work exposed for inspection. For a project that involves your panel, Ace Electric’s guide to electrical panel upgrade cost in Memphis explains what that work involves.
What Happens If You Hire an Unlicensed Electrician?
The risk lands on you as well as the contractor. The county’s code allows several consequences:
- Stop work orders. The Building Official can order electrical work done contrary to the code, or in an unsafe way, to stop immediately.
- Removal of defective work. Work installed in violation of the code must be removed and reinstalled lawfully on written order.
- Extra fees. Starting work before a permit carries an additional fee equal to the usual permit fee.
- Civil penalties. Each day of a violation counts as a separate offense, with civil penalties set by the Electrical Board of up to $50 per violation.
Work without a permit also leaves no inspection record. That matters later. Ace Electric’s guide to electrical upgrades before selling a house explains why unpermitted work becomes a problem at resale.
Where Can You Report a Problem?
If a contractor is unlicensed, misstates their license, or does unsafe work, there are official places to report it. The Tennessee Board for Licensing Contractors has consumer pages for filing a complaint and for viewing disciplinary actions. Develop901’s Construction Enforcement page also links a File a Complaint form, and the county’s Licensing and Electrical lines can tell you what to do next.
Keep your contract, invoice, photos, and any permit records so you can describe exactly what happened.
Can a Homeowner Do the Electrical Work Themselves?
In a narrow case, yes. The county’s code includes an exception that lets a homeowner apply for a permit to install and maintain the wiring in a single-family dwelling that will serve as their principal residence. The conditions are strict:
- The home is not intended for rent, lease, or resale.
- The applicant passes an exam administered by the Building Official, with a score at or above the 70th percentile.
- The work is done solely by the homeowner or immediate family.
The first exam is free, later attempts cost $25, and the code allows only one such permit per person in any two-year period. The Tennessee Board’s document also says a homeowner may obtain a permit for their own work on a residential dwelling only, and that commercial work requires a license.
The exception does not cover hiring a friend, a neighbor, or a handyman. If anyone other than you or your immediate family does the work, they need the license.
What If You Rent Out the Property?
Landlords cannot use the homeowner exception. It applies only to a dwelling that will serve as your principal residence and is not intended for rent, lease, or resale. Electrical work on a rental property has to be done under a licensed or registered contractor’s permit, and the same goes for commercial space.
What About Emergencies and Storm Repairs?
Urgency does not remove the licensing requirement. It does change one step. The county’s code allows emergency repairs to start first, with the permit application due within the next working business day.
After a storm, many homeowners need an electrician quickly, which is exactly when it is easy to skip the checks. Run them anyway, and call the licensing line if anything looks off. Ace Electric’s emergency electrician guide covers which problems need a same-day call.
Frequently Asked Questions
What license does an electrician need in Memphis?
An electrician doing electrical work in Memphis or Shelby County must be licensed or registered under the county’s electrical code. That means a local contractor license from the Office of Construction Code Enforcement, or a state contractor license with a CE classification registered with that office. Individual electricians work under a licensed contractor, with master and journeyman licenses defined in the code.
Is the Tennessee limited licensed electrician (LLE) license valid in Memphis?
No. The Tennessee Board lists Memphis and Shelby County, Bartlett, and Collierville among the jurisdictions that do not accept the LLE license. Electricians there must meet the local licensing requirements or hold a state CE contractor license.
How do I verify an electrician’s license in Memphis?
Check the state record through the Tennessee Board for Licensing Contractors, then confirm the local registration by calling the county’s Licensing line at (901) 222-8390. Also check that a permit exists for your address through Develop901. Do both layers, since the state record alone does not prove local registration.
Does a state CE contractor still need anything else in Shelby County?
Yes. The Tennessee Board says a CE contractor must still follow local permit and licensing rules, pay local fees, obtain permits and inspections, and hold any applicable local licenses. The county’s code adds registration with its code office, a $25,000 bond, and proof of insurance.
Do I need a permit for electrical work in Memphis?
Generally yes. The county’s code requires a permit before installing, altering, repairing, or replacing electrical systems, with a short list of exemptions. The Tennessee Board also says permits and inspections are required for all electrical work regardless of the project’s dollar amount. Ask your electrician whether your job needs one.
Can a handyman do electrical work in Memphis?
Not unless the person is licensed or registered for electrical work. The county’s code says electrical work requires a license or registration, and permits go only to licensed or registered contractors. A handyman cannot pull a permit, and the homeowner exception covers only work done by the homeowner or immediate family.
Final Word
Checking an electrician license in Memphis takes a few phone calls and a quick search, and it protects you from the problems that cost the most later: a stop work order, work that has to be torn out, and an unpermitted job that surfaces at resale.
Check any electrician you are considering, including Ace Electric. If you would like a licensed contractor to review your project, Ace Electric provides residential and commercial electrical work across Shelby County. You can reach the team at (901) 870-3298.
Curated by Ace Electric,
Your trusted electricians in Tennessee.
